With METC MWD plus Gamma instruments in the high temperature/pressure wells, the operator was able to obtain the needed data and successfully complete the well.
• Well No. : Tarim Repu 6C • Drilling Team : Tarim No. 70153 Team • Operator : Anton Oilfield Services (Group) Ltd • Well Type : Ultra - Deep Sidetracking Horizontal Well • Mud Density : 1.16 • Flow Rate : 12~13 L/S • Pumping Pressure : 18~20 MPa • Measured Depth : 7220m • Vertical Depth : 6866.7m • Circulation Temperature : 142℃ • Static Temperature : 156℃ • Construction Unit : Anton Oilfield Services (Group) Ltd |
